|
AUTOQUOTES INTERFACE
Import Projects with thousands of Items in Seconds
Creates items that do not exist
Preserves the accessories and options of items
Use the AQ Project number or assign through TRX Enterprise™
Creates customer (if desired)
PROJECT CONTROL
TOOLKIT
Management by exception: identify MFG w/ shipping date issues, drill down to the PO detail to see which items and enter status notes for PM reports
Track and report status of POs to Project Manager
Create Warranty letters
Create Price Protection Letters
Complete Project Reporting
Billing Sheet showing original contract and change orders
Contract Status Report for field review
Project Analysis Report
Customer Sign Off sheet for Materials
To contact us:
Phone: 727.797.4707
Fax: 727.797.4846 E-mail: sales@trxi.com
|
|
PROJECT BILLING
Milestone or Progress billing
Proper recognition of customer deposits not tied to Materials
AIA Billing
Calculate Retainage
Summarize Items without Accessories as completed or Stored Materials
Bill % for down payment by item
Quantify Change Orders on the G703 form
Change Orders roll up into one line
Final Billing
Bill Materials, Install and Freight to recognize revenue
Auto Apply Credits for Milestone or AIA billing
Accruing Revenue
Accrue revenue based on % complete method
Auto Reverse accruals
EQUIPMENT HANDLING
All items imported from AQ
Generate Project POs in minutes with complete tie to accounting
Change Orders can ADD, CHANGE, DELETE or REPLACE items
Changes existing PO’s without user action
Create Pick Tickets for Project
Ship Pick Tickets and enter serial numbers
O&M INDEX REPORT
Assign Service Agency to MFG on Project
Serial Numbers Displayed by Item
Print Index Report for O&M Manuals
|